Location the very first plank With all the tongue side dealing with the wall. Press the end seam of the second plank into the end seam of the first plank, and then lock them together by laying the plank down. Continue Doing the job remaining to suitable. In terms of https://cruzkigbz.is-blog.com/37783992/5-simple-techniques-for-spc-flooring-manufacturer