Be certain that the substrate is effectively sealed and that all hungry locations are addressed just before proceeding to set up the process. In the event the overcoating period of time for the primer is exceeded, the surface need to be lightly abraded and vacuumed ahead of even further coats https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/