He additional that Period two would include the stretch within the Lekki next toll gate to the Ajah under-bridge and could be divided into 4 sections. “Motorists from Ajah inward Lekki are going to be diverted to at least one lane when repairs are ongoing on the opposite lane,” Osiyemi https://actorg420cfj2.bimmwiki.com/user